WEEKS 11:LAND CLEARING AND REPAIR THE BEES' NEST
DATE: 14 JUNE 2024
WEEK: 11
Place: Plot Kelulut
INTRODUCTION:
This week's activities include clearing land on our plot. We cleared the plot of all dry leaves and placed them in the decomposing area. In addition, we work on some repairs at the stingless bee house before moving on to our group project.Sir Zafri gave us a briefing during which he discussed oil palm harvesting. The most crucial task on an estate is harvesting. It involves FFB's physical recovery. Harvesting typically began 26 to 36 months after planting, depending on the rate of vegetative growth. Harvesting is limited to a height of fifteen metres.
OBJECTIVES:
- To improve the stingless bee house.
- To enhance the plot.
- To make the plot look tidy
-DO IT EXERCISE
-TAKE ATTENDANCE
7.30AM-8.30AM
-GO TO AGROTECH
-SINGING 3 SONGS WHICH ARE NEGARAKU, WAWASAN SETIA WARGA UITM AND PLANTER'S SONG.
-TAKE TOOL AND GO TO THE PLOT
8.30AM-10.00AM
-BRIEFING BY SIR ZAFRI ABOUT THIS PLOT
-DO IT THE ACTIVETIES
10.00AM-10.30 AM
-REST
10.30 AM-11.00 AM
-DO DISCUSSION WITHIN THE GROUP
-GO BACK TO THE KOLEJ
COSTING
MATERIAL COST:-
LABOUR COST:-
TOTAL:-
SUMMARY OF THE ACTIVITY,KNOWLEDGE AND SKILL LEARNED
-In summary,we have made some changes to maintain the sustainability of the kelulut plot.
OBSERVATION:


Comments
Post a Comment