WEEKS 11:LAND CLEARING AND REPAIR THE BEES' NEST

 DATE: 14 JUNE 2024

WEEK: 11

Place: Plot Kelulut

INTRODUCTION:

This week's activities include clearing land on our plot. We cleared the plot of all dry leaves and placed them in the decomposing area. In addition, we work on some repairs at the stingless bee house before moving on to our group project.Sir Zafri gave us a briefing during which he discussed oil palm harvesting. The most crucial task on an estate is harvesting. It involves FFB's physical recovery. Harvesting typically began 26 to 36 months after planting, depending on the rate of vegetative growth. Harvesting is limited to a height of fifteen metres. 

OBJECTIVES:

  • To improve the stingless bee house.
  • To enhance the plot.
  • To make the plot look tidy

TOOLS AND EQUIPMENT

                                                             WHEELBARROW

                                           

TRASH CLAWS
Nature of work done

6.30am-7.20am

-ROLLCALL 

-DO IT EXERCISE

-TAKE ATTENDANCE

7.30AM-8.30AM

-GO TO AGROTECH

-SINGING 3 SONGS WHICH ARE NEGARAKU, WAWASAN SETIA WARGA UITM AND PLANTER'S SONG.

-TAKE TOOL AND GO TO THE PLOT

8.30AM-10.00AM

-BRIEFING BY SIR ZAFRI ABOUT THIS PLOT

-DO IT THE ACTIVETIES

10.00AM-10.30 AM

-REST 

10.30 AM-11.00 AM

-DO DISCUSSION WITHIN THE GROUP

-GO BACK TO THE KOLEJ


COSTING

MATERIAL COST:-

LABOUR COST:-

TOTAL:-

SUMMARY OF THE ACTIVITY,KNOWLEDGE AND SKILL LEARNED

-In summary,we have made some changes to maintain the sustainability of the kelulut plot.

OBSERVATION:

                       